Floor area, the kind of building, the level of finish, fees and a contingency. An order of magnitude for the first conversation with the client.

Building
m²
€/m²
Level of finish
%
%
Currency
Estimated total
€392,040
Construction
€324,000
Design fees
€32,400
Contingency
€35,640
Per m² all in
€2,178

A first order of magnitude for an early conversation. Rates differ by country, city and year; put in the rate your contractors quote and the finish factor does the rest.

A first budget, early

The first question a client asks is what it will cost, and the honest answer at that point is an order of magnitude. This estimator gives one: floor area times a rate, adjusted for the level of finish, with design fees and a contingency on top.

The presets are starting points for a house, apartments, an office, retail and a renovation. Rates move with the country, the city and the year, so replace the preset with the cost per square meter your contractors are quoting now.

Keep the contingency. Ten percent is the usual allowance at concept stage, and it shrinks as the drawings firm up. A budget without it is a budget that will be exceeded.

Use the all in cost per square meter to compare options quickly: a bigger house at a basic finish against a smaller one at a high finish, before any of them is drawn.

Other free tools

The numbers are done. Now the image.

Turn the sketch, plan or model into a render the client can react to.